Gries power plant, Austria

Kochendörfer manufactures and supplies the complete machine technology for the Gries power plant in Austria with 2 vertical direct-coupled Kaplan turbines of 4.65 MW each. Successfully put into operation in March 2019.

2 vertical Kaplan turbines
Output 4.65 MW each, drop height 8.90 m

Verbund & Salzburg AG, Gries power plant, Austria. In March 2019, Verbund and Salzburg AG celebrated the success of the newly constructed Gries an der Salzach power plant with a public inauguration ceremony.